UK nuclear plant hit by new multiyear delay and could cost up to £35bn | Latest overrun to Hinkley Point C a blow to UK energy plans and French constructor EDF - eviltoast
  • silence7@slrpnk.netOP
    link
    fedilink
    English
    arrow-up
    9
    arrow-down
    2
    ·
    10 months ago

    At the cost it comes in at, it competes with longer-duration energy storage. Very expensive, and only has value to the extent that it reduces the need to build storage instead.