France's most powerful nuclear reactor connected to grid after 17-year build - eviltoast

Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • GoodEye8@lemm.ee
    link
    fedilink
    English
    arrow-up
    4
    ·
    1 day ago

    Nuclear power has its own mining and rare material problems, in the form of uranium. You have to dig into the earth for it, and then after you use it, poison part of the planet forever. We still dont know what to do with all the nuclear waste we alrwady made.

    Thorium is 3-4 times more abundant than uranium, is generally safer to use and would produce less waste that is also less radioactive and can become safe in a reasonable timeframe (few centuries compared to few hundred/thousand? centuries). Historically the main issue with Thorium has been that it’s not as sexy as uranium because you can’t make nuclear weapons out of thorium.