France's most powerful nuclear reactor connected to grid after 17-year build - eviltoast

Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • Dragon Rider (drag)@lemmy.nz
    link
    fedilink
    English
    arrow-up
    22
    arrow-down
    4
    ·
    2 days ago

    That said, now that solar and wind are cheaper, conservative politicians are finally pushing for nuclear, because 17 more years of building at 4 times the budget means more fossil fuels in the meantime compared with spending those government funds on solar and wind.