France's most powerful nuclear reactor connected to grid after 17-year build - eviltoast

Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • gaael@lemmy.world
    link
    fedilink
    English
    arrow-up
    12
    ·
    2 days ago

    The military nuclear is the main reason behind our civilian nuclear infrastructure, which was planned during the cold war. It looks like once per century the military can have an unintended positive effect, yay.

      • gaael@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        1 day ago

        Don’t get me wrong, I’m in no way advocating for military nuclear (or even for anything military).