@southrncadillac - eviltoast
  • 0 Posts
  • 4 Comments
Joined 1 year ago
cake
Cake day: November 11th, 2023

help-circle


  • Welcome. Here is a more detailed answer

    Hammer hook nails into the stud (make sure to hammer a hook nail within 4 inches of your main hole at the top of the stud bay, and hammer another hook nail within 4 inches of your low voltage box, and then hammer another hook nail within 4 inches of the bottom. Then run zip ties through the hook nails to secure your wires. Any zip ties below the low voltage box will be zipped loosely around the wires through the hook nail so you can pull the wires up and out when you are ready to terminate.

    Basically just follow what the electricians do, but leave your stuff loose enough to pull back up and out the wall after drywall.

    If you zip tie too tight you will have to yank hard to get one wire free then the rest will move easily, or you will need to cut Sheetrock to get your wires back out the wall.