San Francisco to pay $212 million to end reliance on 5.25-inch floppy disks - eviltoast
  • reddig33@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    ·
    edit-2
    16 days ago

    Not disputing what you said — just clarifying that other upgrades are not part of the $212 mil and what is meant by “whole system”. The $212 is just to replace the floppy based system with something newer that includes a service contract.

    “Beyond the floppies, though, the Muni Metro needs many more upgrades. The SFMTA plans to spend $700 million (including the $212 million Hitachi contract) to overhaul the light rail’s control system. This includes replacing the loop cable system for sending data across the servers and trains. The cables are said to be a more pressing concern than the use of floppy disks. “

    Supposedly the new system is five gens ahead of the old system and would have additional features. Some would say “if it ain’t broke don’t fix it” but whatever. I’m sure it will be as fancy as upgrading to Windows 11 at that price.

    • exasperation@lemm.ee
      link
      fedilink
      English
      arrow-up
      2
      ·
      15 days ago

      Yeah, I understand the article to be saying that the Hitachi contract is for the train control system, including the software and equipment necessary for the operation of the train underground. The broader system upgrades include communications systems between trains and stations. At least how I read it.