UPDATE: The slab is flat... ish - eviltoast

There is a lot more checking than I realized, and I’m afraid filling these gaps by just pouring in epoxy will be difficult. I want to keep the live edge and avoid making a complete deep pour epoxy mold. Some of these gaps go all the way through The 2-in slab. Any tips for me?