Have you ever been enthusiastic about any corporate project? Did it turn out the way you imagined? - eviltoast
  • JeeBaiChow@lemmy.world
    link
    fedilink
    arrow-up
    4
    ·
    8 months ago

    Yes, actually. After a few months as a process consultant at separate electrical distribution manufacturing operations, I postulated that their design process could be dramatically automated. Right now we have two working custom CAD systems in separate parts of the distribution pipeline that serve as the basis for the rest of the company operations. Chuffed to say the least!