First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia - eviltoast

First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • ephemeral_gibbon@aussie.zone
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 year ago

    Ah sorry, my mistake. I messed up there.

    The battery in SA is really just for grid stabilisation, not long term storage. Batteries are not really a good soln for longer duration storage. You need surprisingly little storage though when they’ve modelled fully renewable grids which is why the projected costs aren’t stupidly expensive.

    • ZodiacSF1969@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 year ago

      That’s interesting, I’m an EE but in industry atm. I’d like to look into that whole scenario one day and see how much storage we’d need to go fully renewable.