    Not complicated at all. For the most part, all they do is swap one box - the transmitter. That’s it.

    (However, that doesn’t consider other things, like improvements in redundancy and safety, or construction standards that didn’t exist back then.)

    But really, all that needs to be done is pull out one box, and slide in a new box. Not complicated at all.