i'm at a loss - eviltoast
    • pingveno@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      ·
      2 days ago

      Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.